| These activities summarily consisted of:- |
 | Re-furbishment of HV Switchgear |
 | Replacement of Main LV Switchpanels (whilst building was occupied) |
 | Replacement of generator controls panels including synchronisation of 4 No sets with load shedding |
 | New UPS Installation consisting of 4No x 300KVA modules configured in an N+1 arrangement |
 | New UPS Input / Output Switchboard |
 | Re-furbishment of the atrium and reception area. |
 | New comm´s room |
 | Re-furbishment of office floors levels 1 to 8 |
 | Level 9 Restaurant and meeting rooms |
 | Level 10 Chairmans suite |
| | |
| Services consisted of:- |
 | Low level power consisting of underfloor bus-bar and flush floor boxes |
 | Automatic addressable Lighting Control system |
 | Pre-fabricated modular wiring system |
 | Fire Alarm Installation |
 | Modular light fittings and downlighters |
 | New UPS Rising bus-bar c/w plug in tap off units |
 | Power to Mechanical Plant |
 | Disabled toilet alarm system |
 | PDU´s to comm´s room |
 | Comm´s room lighting and power |