These activities summarily consisted of:-
#Re-furbishment of HV Switchgear
#Replacement of Main LV Switchpanels (whilst building was occupied)
#Replacement of generator controls panels including synchronisation of 4 No sets with load shedding
#New UPS Installation consisting of 4No x 300KVA modules configured in an N+1 arrangement
#New UPS Input / Output Switchboard
#Re-furbishment of the atrium and reception area.
#New comm´s room
#Re-furbishment of office floors levels 1 to 8
#Level 9 Restaurant and meeting rooms
#Level 10 Chairmans suite
  
Services consisted of:-
#Low level power consisting of underfloor bus-bar and flush floor boxes
#Automatic addressable Lighting Control system
#Pre-fabricated modular wiring system
#Fire Alarm Installation
#Modular light fittings and downlighters
#New UPS Rising bus-bar c/w plug in tap off units
#Power to Mechanical Plant
#Disabled toilet alarm system
#PDU´s to comm´s room
#Comm´s room lighting and power
 
  Express Newspapers Fit Out, Lower Thames Street Express Newspapers Fit Out, Lower Thames Street Express Newspapers Fit Out, Lower Thames Street  
         
Phoenix Electrical - Phoenix Mechanical - Phoenix Maintenance
 
PHOENIX Electrical Company Limited Cityside House 40 Adler Street London E1 1EE Tel: 02074221900 Email: Dave Cunningham or Adam Jolliffe

Website is W3C Compliant