We carried out the following activities:- |
 |
Package Substation with sub-mains cabling to 3 main internal risers |
 |
Essential and Non Essential rising bus-bar systems where provided within two of the risers. Each riser consisted of essential and non essential LV distribution boards at each floor |
 |
Modular wiring installation of the lighting was installed allowing future flexability for changing retail needs |
 |
Lighting control for security and general where provided by contactors which provided central switching to the store |
 |
A fully addressable Fire alarm installation with interfaces for automatic shutdown and controls of lifts, main plant and kitchen equipment |
 |
A Public Address system was installed throughout the store for distribution of music |
 |
Self contained emergency lighting battery packs where installed to meet the M3 requirements |
 |
CCTV was provided to cover the store utilising PTZ cameras to a central security room at third floor |
 |
Underfloor power was installed within screed to tills and unitary with additional lighting to wall mounted display unitary added via the modular wiring system |
 |
An Intruder Alarm was installed throughout the store with facility for remote central control |
 |
Roof mounted generator was provided to provide essential coverage to essential circuits and dedicated plant |
 |
Roof Plant: - Roof Path way lighting and power. - Bulk Electrical Supplies to chiller units and air handling plant |
 |
Restaurant: - Architectural lighting to suite featured ceilings and bulkheads |
 |
Externally: - External lighting to colonnade and external facade |