| We carried out the following activities:- |
| |
|
 |
2no Ring Main Units and Transformers feeding 2no Main LV Switchpanels, 1no Generator Switchpanel and 2no UPS Switchpanels. |
 |
Provision of 2no UPS´s |
 |
Provision of 2no Generators |
 |
Complete Castell interlocking system. |
 |
Main Switchpanels, UPS and Generator Switchpanels and UPS equipment where linked together via high level busbar system |
 |
Essential and Non Essential rising bus-bar systems where provided within two risers. Each riser consisted of essential and non essential LV distribution boards at each floor |
 |
Central Atrium feature lighting and power installation with central gantry crossing between each wing |
 |
The lighting installation was carried out utilising busbar and dalmatic lighting control system with timeclock control of overall system and local switching provided to individual rooms |
 |
A fully addressable Fire alarm installation with interfaces for automatic shutdown and controls of lifts, main plant and kitchen equipment |
 |
Self contained emergency lighting battery packs where installed to meet the M3 requirements |
 |
Underfloor power was provided via floortrack and cable basket |
 |
CCTV was provided to cover the building utilising column mounted PTZ cameras to a central security room at ground floor |
 |
An Access Control system was installed throughout the building |
 |
| Roof Plant: |
Roof Path way lighting and power. |
| |
Bulk Electrical Supplies to chiller units and air handling plant |
|
 |
| Externally: |
External car park lighting installation including columns and batten luminaires to undercroft car park |
|