| This is a full turnkey Mechanical and Electrical fast track project for Phoenix working closely with McLaren construction generally within Data Hall Suite 150/160 to suit the clients power and cooling requirements. |
| |
|
| Electrical Works :- |
 | Installation of new HV cabling and containment ladder to 5no new transformers serving LV switch rooms within suite´s 150 & 160 including HV control cabling and containment |
 | Installation of LV distribution cabling from the HV transformers to the S150 & S160 switch panels including the modification of an existing transformer for the S150 resilience to the LV system |
 | Installation of LV distribution cabling from the switch rooms to the new client procured plant including chillers, CRAH units, AHU´s, generators, UPS modules, power distribution units and packaged pump rooms |
 | New lighting & power distribution complete with boards to the data halls including all servicing areas |
 | Specialist lighting |
 | Management and control of specialist contractors during commissioning & IST |
 | Protection coordination study |
| |
|
| Mechanical Works :- |
 | New package plant rooms to accommodate the S150 & S160 layout for the pumps to the external chilled water pipe work |
 | Installation of new down flow units to suit the cooling requirements for the data suites |
 | Installation of chilled water pipe work within the data suite to take into account the demand of the CRAH units |
 | Installation of new AHU units associated extract fans, grills and ductwork system to accommodate the data hall installation, battery rooms and switch rooms |
 | All associated soft and hard lagging requirements |
 | Installation of new trace heating and leak detection cabling to cover all service pipe work |
 | Testing, commissioning and reporting on all aspects of the installation |
 | Installation of 5No 750kw free cooling chillers |
 | Full integration of all mechanical and electrical services |