Riverbank House
Riverbank House
Riverbank House
Riverbank House
  + -
Riverbank House
 
Riverbank House  
 
Case History  
Project Team  
 
ManGroupl plcFit out works existing building located on the River Thames. A new IT Infrastructure will be installed including Package Substations, UPS System, PDU´s including Fire & Gas Suppression Systems, Smoke Extract Systems.

The building will be monitored from a third party BMS system however the building switchgear will be monitored and controlled by a SCADA system which will also allow interrogation of the Intelligent meters.

The lighting control is based on the DALI system with DALI controllers being plugged directly to the Building services systems via CAT 6 cabling to enable complete control from any location subject to authorization.

Riverbank House will be fitted out in various forms as described below;

The Basement Tenant areas include, Staff Showers, Catering Staff changing facilities and Showers, Engineers workshop and Tenant Plant.

The ground floor includes the Reception area X–ray room, Post room, Auditorium, Staff Restaurant, Bar, Kitchen and Loading Bay.

Levels 1, 2, 3, 4, & 5 shall have a Category A fit–out

The 6th floor comprises open plan and cellular office accommodation, Post room,Reprographics room.

The 7th floor comprises open plan and cellular office accommodation, training room and UPS Plant room and CER room.

The 8th floor is the executive office area comprising open and cellular office accommodation and the Executive area.

The 9th floor comprises the executive reception area, business centre, executive dining rooms, Executive kitchen, boardroom and meeting rooms.
   
Works included:-
#HV Cabling from the roof to Level 7 Package Sub–station
#HV Package Sub-station / UPS Input Output Switchpanels
#Mechanical UPS input / Output Switchpanels.
#UPS Systems
#Electrical Risers – Cabling and Distribution Boards
#Electrical Risers – 630Amp and 400 Amp Rising Bus-bar
#IT Room and Mechanical PDU´s
#Electrical Distribution boards
#SCADA Power Management installation and commissioning
#EMS installation and commissioning.
#Level 7 CER Room.
#SER Rooms (1No Ground, 2No on 4th,5th and 1No 9th Floors)
#Gas Suppression to IT rooms and Level 7 UPS Room
#VESDA to IT rooms and Level 7 UPS & CER Room
#Underfloor Bus-bar / Small power
#Desk Power
#High Level Containment Systems
#Modular wiring system serving Lighting and Fan Coil Units
#Lighting Controls
#Fire Alarms
#General Office Lighting
#Specialist Lighting – Ground and 9th Floors
 
  Riverbank House Riverbank House Riverbank House Riverbank House
         
Phoenix Electrical - Phoenix Mechanical - Phoenix Maintenance
 
PHOENIX Electrical Company Limited Cityside House 40 Adler Street London E1 1EE Tel: 02074221900 Email: Dave Cunningham or Adam Jolliffe

Website is W3C Compliant